Trying to build and control processes that have been worked out invariably leads to three things:
- controlling the processes rather than working within them;
- actually making it more difficult to work in them and lowering overall efficiency;
- team-wide falling into the trap of a false sense that everything in the product is under control and "since we have processes, we are insured against everything and nothing will happen".
In practice, everything is exactly the opposite.